Essential Terms — C10
The Hamilton and Alexandra College · Year 12 · 2026
A glossary of every term you need to recognise and use correctly across C10. Click a term to expand its definition. The three class writes are handwritten with no internet and no notes, so this vocabulary has to be in your head.
flowchart TD
R["C10 vocabulary<br/>26 terms"]
R --> G0["The judgement<br/>4 terms"]
R --> G1["What you judge against<br/>5 terms"]
R --> G2["Quality factors defined here<br/>8 terms"]
R --> G3["The plan<br/>4 terms"]
R --> G4["Why plans move<br/>3 terms"]
R --> G5["Nearby, but NOT VCAA factors<br/>2 terms"]
Where the C10 vocabulary sits, and how much of it is in each group — the 6 sections below follow the same order. Revise the heavy groups first.
The judgement
Evaluation
The final stage of the problem-solving methodology. It checks how well the solution is satisfying the needs of the user for which it was originally created.
Evaluation criteria
Performance criteria made from the expectations and specification.
Testing
Checks the accuracy of information outputs.
Beta testing
The phase of software testing where a sample of the intended audience tests the software in a real environment.
What you judge against
Software requirements specification (SRS)
A single document that contains the outcomes of the analysis stage of the problem-solving methodology, including scope, constraints, functional requirements and non-functional requirements.
Functional requirements
The desired operations of a program that have specified inputs, behaviours and outputs.
Non-functional requirements
Qualitative requirements of a solution, often tied to solution constraints.
Constraints
Factors that may limit or restrict solution requirements.
Solution boundaries
The limits or edges of what a project or solution will encompass.
Quality factors defined here
Completeness
The extent to which all necessary features and functionality are included in the software.
Functionality
The extent to which a solution is suited to its purpose.
Accuracy
The degree to which software correctly performs its intended functions without errors.
Usability
The extent to which a system is easy to learn and use.
Accessibility
Ensures that software can be used by people with a wide range of abilities and disabilities.
Relevance
The degree to which software meets the current needs and requirements of its users or market.
Timeliness
The ability of software to provide information or functionality when it is needed, without undue delay.
Maintainability
How easy a solution is to look after once it has been put in place.
The plan
Project management
A method of recording the progress of a project and managing resources to operate within time, resource and cost availability.
Gantt chart
A type of bar chart or graphic timeline that shows the progress of a project by placing tasks on a timeline, often with comments or annotations.
Problem-solving methodology (PSM)
An approach that develops the stages involved in solving a problem.
Version control
The method that keeps track of the current, most up-to-date document through a drafting process.
Why plans move
Scope creep
The tendency for a project's requirements to increase over time, often leading to delays and budget overruns.
Personnel changes
Modifications or transitions in the team composition that can impact the development process and timelines.
Technical issues
Challenges or problems related to the technology being used in software development, potentially impacting project progress.
Nearby, but NOT VCAA factors
Fit for purpose
To be well suited for a role or purpose.
Reliability
How much a solution can be depended upon to function as designed, and for how long.
See also
- C10 home page — everything else for this criterion
- Efficiency vs Effectiveness — the full VCAA lists: exactly 3 efficiency factors and 11 effectiveness factors; only the ones this glossary defines appear above
